Local 793 member Brittany Beard has been actively working on the Highway 400 and Innisfil Beach Road overpass replacement with Fermar Paving Limited.

Innisfil’s main interchange is getting this much-needed revamp to accommodate the future 10-lane widening of the main highway, expected to be complete by 2031.

Sister Brittany is operating a Volvo EC480E excavator in the second picture.