Local 793 members are hard at work for the Township of Huron-Kinloss on the Ripley Industrial Park subdivision project in Bruce County, ON. This project which is projected to be completed by summer 2022 involves the constriction of roadways and ditches, the installation of gravity and low-pressure sanitary sewage systems, the installation of watermains, and the construction of a storm water management facility.

Below is a photo of Local 793 members (L to R) Tim Weber, Dave Spoenlein and Local 793 steward Bob Blackwell standing in front of a Cat 770G grader and a Cat 930K loader at the Ripley Industrial Park shop.

Local 793 members Tim Weber, Dave Spoenlein and steward Bob Blackwell standing in front of a Cat 770G grader and a Cat 930K loader at the Ripley Industrial Park shop.