Local 793 members are busy working for Bird Constriction at the Bruce Power watermain and firewater update project in London, ON. This project is essential to ensure that the Bruce Power Generating Station can operate safely and continue to provide residents with a reliable source of power.
Below are some photos of Local 793 members onsite.
Photo 1: Justin Cipollone is operating a Link-Belt 210 X2 excavator.
Photo 2: Jeremy Huff is operating a CX2450 SR excavator.
Photo 3: Renato Urbano is operating a John Deere 544K loader.