Brother Blake Fairbairn operates a John Deere 750K XLT bulldozer prepping highway 401 lanes for a widening project in Cambridge.
Part of the Highway 401 expansion project, estimated at $100 million, has Local 793 member Fairbairn prepping the original three eastbound lanes for paving.
The contract looks to widen six lanes to ten, replace the Hespeler Road bridges, and rehabilitate the Townline Road underpass and the Wellington County Road 32 underpass.