Local 793 member Dave Wolochatiuk operates a Cat 5110BL excavator on a Drain Star site for road reconstruction and widening in Pickering. Brother Wolochatiuk is installing box culverts for stormwater at the site along Concession Road 3 and Valley Farm Road. This project is estimated to be completed by the summer of 2025.