In late 2017, a steel support structure was erected around a new Liebherr 85 EC-B 5 tower crane at the OETIO training campus in Oakville. The structure enabled the crane to be used for training students in top-and-bottom climbing procedures, putting Local 793 at the forefront of crane training.